Data Acquisition
Implementation Process
01
Data acquisition (collection)
Image, point cloud and other data collection according to the design parameters of Hangfei
02
Field survey
Collect approximate coordinates of control points; field control survey
03
Data preprocessing
Conversion of special format into general format and other preprocessing
06
Submission of results
After passing the inspection of results, the results shall be sorted out and submitted according to project requirements
05
Quality inspection
According to the industry specifications such as "Quality Inspection and Acceptance of Surveying and Mapping Results", the system of two-level inspection and one-level acceptance shall be strictly implemented
04
Data results production
production of 3D model, DOM, DEM, DSM and other results
Application Area
  • Urban planning and construction
    It provides accurate data support for urban land use, traffic planning and environmental monitoring.
  • Agricultural sector
    It plays an important role in precision agriculture, land resource survey, crop yield estimation and other agricultural management.
  • Geological and resource survey
    Through the survey and identification of landforms, geological disasters can be warned and evaluated.
  • Environmental protection and monitoring
    Monitor vegetation coverage, water changes and pollutant discharge to provide timely and accurate information for environmental protection.